guide:applicant:application:sample:gram-panchayat
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revision | Next revisionBoth sides next revision | ||
guide:applicant:application:sample:gram-panchayat [2016/04/17 10:40] – [Include the following in your RTI Application] Shrawan | guide:applicant:application:sample:gram-panchayat [2016/04/23 16:21] – [Include the following in your RTI Application] Raveena | ||
---|---|---|---|
Line 53: | Line 53: | ||
//(Schedule of work shall show quantity of each item included in a contract. With the schedule of work in hand, you can cross-verify physical quantum and assess discrepancy if any.)// | //(Schedule of work shall show quantity of each item included in a contract. With the schedule of work in hand, you can cross-verify physical quantum and assess discrepancy if any.)// | ||
- | You can cut-paste query items in your RTI Application after deleting italics and bold bracketed portion. | + | You can cut-paste query items in your RTI Application after deleting italics and bold bracketed portion |
+ | |||
+ | {{: | ||
---- | ---- | ||
[<>] | [<>] |
guide/applicant/application/sample/gram-panchayat.txt · Last modified: 2018/09/15 13:33 by Shrawan